Friday, 7 February 2014

Site Visit 06.02.14

ESH.1.01- decorations underway- light installation underway- drops to be extended to allow fittings to be below beam level

ESH.1.05 Meeting room- data cable installation complete- containment has not been provided

SH.2.10- remove switch and all other redundant cabling

Exams Paper store SH.1.10- Picture rail mismatched

SH.1.11 Exams Office- make good decs

Make good under emergency light fitting to stair adjacent ID.01.17 (outside exams office)

Evidence of water ingress over window EW.00.08 to Paper Store SH.G.15

Main Door ED.00.05 now painted, ironmongery fitted.

Make good/ redec around all areas internally where emergency light fittings and sounders are removed in lieu of new installations

Decorate or box around existing pipes to Database Office SH.G.09

Existing carpets retained- require builders clean

 Drainage underway for external downpipe

Redecorate to all areas where door closers have been installed

1 comment:

  1. Thank you for your post. This is excellent information. It is amazing and wonderful to visit your site.
    House Refurbishments in Clapham

    ReplyDelete