Lining paper to cbd SH.1.06- make good/ redec
Ditto
Trunking SH.1.06- Make good dec/ mastic dado
Reinstate carpet SH.1.06
Radius to conduit/ bulkhead SH.1.06 to be rectified
Decoration adjacent ID.01.19/ dado- complete
Complete carpets 1st floor
Ditto
Remove redundant cables to picture rail SH.1.04
SH.1.01- address mortar/ carpet tile/ skirting interface
Cap dado adjacent fireplace SH.1.01
Make good junctions to dado trunking SH.1.01
Ditto
SH.2.06- nearing completion
SH.2.06- Mastic to boxing in
SH.2.06- Complete decs adjacent dado/ door
SH.2.02- 2nd coat to rooflight lining required
SH.2.02-crack below purlin- M/G redec
SH.2.02- dado interface- redo
SH.2.02- Decorate behind purlin
Temp alarm install phase I/ complete system phase II
Complete Sikkens decorations to exposed purlins/ purlin props 2FL
Install guarding SH.2.04
Install handrail- Part M compliant- Stair 1
Clip cables to rooflight- all 2FL
All carpet/ nosings to stair 1 complete
Make good decs to stair 1
Exposed threads to conduit SH.2.04
Complete ironmongery installation EW.01.05
SH.1.05- install grille to wall
SH.1.05-complete dado
Ditto
SH.1.05-complete door decs ID.01.04
Stair 1 soffitt 1FL to GFL- make good/ redec
decs/ stair lining make good decs GFL
SH.G.07- make good bulkhead/ decorations
SH.G.07-firestop services penetrations
SH.2.09-firestop services penetrations