Bikes to be removed from SH.G.17 external courtyard
Equipment to be removed from SH.G.06, currently a Paper Store
Any important notices to be removed prior to Bolt & Heeks removal of boards in corridors.
Shelving to be removed from SH.G.07, Common Secretaries Office
Ceiling to SH.1.05 has layers of redundant finishes including polystyrene tiles. B&H to remove loose surfaces. Heavy replastering to ceiling required.
Ditto
Cornice to ceiling is still intact beneath ceiling finishes.Cornice to be uncovered and restored.
Roof tiles have been found behind plaster along spine wall between SH.1.05 & SH.1.06
Ditto
Stress UK works have left the Bressumer beam brickwork exposed. CVA to establish whether any further works will be required internally.
Removal of fire lining to cupboard to SH.1.04 has revealed door does not have paneling. CVA proposed replacing door and fixing cornice. Conservation officer to be consulted.
Timber containment to be repaired in SH.1.02
Steel support to cupboard in SH.1.02 to be retained.
Skirting to be replaced to prevent heat loss. CVA to instruct.
Boxing in to services in SH.1.02 has been removed.
High level tank to flank wall to be removed. B&H to cost.
Ditto
Joinery and false walls to SH.2.01 allow an additional 700mm to room extents. CVA to propose strategy for retainment. Further opening up works will be required to establish the direction of chimney stack.
Ditto
Ditto
High level chimney to SH.2.02 will require boxing in
Wood rot to spine wall requires investigation
Ditto
Fireplace to SH.1.08 has been opened up. CVA to instruct repair and redecoration.
Partition to tank room SH.3.01 has been removed and temporarily stored to allow access to tanks.
Ditto
Cupboard to SH.1.07 will require clearing before Phase 2 commences.
Ditto
Tank to SH.G.13 will be removed and capped. Storage to be cleared to allow clear access.
Window to SH.G.13 requires refurbishment. Additional storage to be cleared to allow access.
Pipe work to tank to be capped. B&H to discuss with OR consulting
Window to SH.G.14 requires repair. Storage to be cleared to allow access.
Ditto
Ditto
Existing lead flashing to north flank wall is in good condition.
Dormers to east roof are roofed in asphalt.
Condition of roof tiles to east roof.
Lead to south east flank wall requires replacement as specified.
East roof elevation.
East valley roof has newer tiles which are in good condition.
West valley roof tiles are in poor condition
Chimney scaffold has been erected.
Render to valley end wall is to be removed and brickwork repaired.
North east chimney to be repointed and repaired.
Copings to end walls to be replaced.
Ditto - secret lead flashings are to be fitted to wall end
South east chimney to be repointed and repaired.
South west chimney to be repointed and repaired.
Dormer roofs to front elevation are covered in lead as apposed to Zinc as originally thought.
View to valley gutter from chimney scaffold.
South east chimney requires reflaunching and rebedding.
Dormer roofs to back elevation are covered in asphalt.
Lead hopper to parapet gutter to be cleared and reused.
Lead flashing to redundant chute outlet to be removed.
Copings to flank wall to be replaced. Redundant soil pipe to be removed.
Soil pipe currently runs to neighboring roof and runs through parapet. Opening to be blocked up after removal.
Soil pipe is directed through parapet cornice. Lead to cornice in good condition. Opening to be reused for rain water pipe as specified.
Parapet gutter to be relined in asphalt. Asphalt costs high due to equipment hire and high level working. CVA to request cost for lining in lead.
Dormers in poor condition on close inspection. Lead work to dormers to be re-designed to prevent water damage after refurbishment works. Drip detail and front flashings required. CVA to discuss with lead subcontractor.
Ditto