Opening up for west pad stone for steel in SH.G.07 has revealed 100m timber beam below bottom of floor joists. This will not allow steel to be installed in proposed location. HRW to advise.
Ditto - opening up for east pad stone in SH.G.07
Ditto - opening up to west pad stone in SH.1 06
Ditto - opening up to east pad stone in SH.1.06
Opening up to floor in SH.1.01 to allow installation of floor ties have revealed 3 existing steel ties.
Two ties are located below each window on the west facade and connect the perimeter floor joist with the masonry wall.
At joist level, the perimeter wall is masonry. Proposed ties to floor joists will require revised proposal for connection to perimeter wall.
The third existing tie runs north to south on the east side of the perimeter floor joist.
Ditto - opening up for east pad stone in SH.G.07
Ditto - opening up to west pad stone in SH.1 06
Ditto - opening up to east pad stone in SH.1.06
Opening up to floor in SH.1.01 to allow installation of floor ties have revealed 3 existing steel ties.
Two ties are located below each window on the west facade and connect the perimeter floor joist with the masonry wall.
At joist level, the perimeter wall is masonry. Proposed ties to floor joists will require revised proposal for connection to perimeter wall.
The third existing tie runs north to south on the east side of the perimeter floor joist.