Roof tile samples.
Top row from left to right: Reclaimed tile, Ashbury, Barfiled
Bottom row from left to right: Existing roof tile, Keymer Traditional Elizabethan, Keymer Traditional Wealden Red, Keymer Traditional Antique
Reclaimed Tile
Ashbury
Barfield
Keymer Traditional Antique
Keymer Traditional Wealden Red
Keymer Traditional Elizabethan
Existing roof tile
Dormers to be demolished. Photo record of existing dormer fascia profile.
North west chimney stack condition
Chimney pots to South East chimney in cracked condition prior to reflanching
Ditto
Ditto
Bricks to South East chimney require repair.
Ditto - approx 6 brick faces to be repaired
Ditto
Ditto
Ditto
Ditto
Repointing required to all lower bricks
Ditto & brick to be replaced at low level
Areas requiring repointing and brick fascias to be repaired
South West chimney stack requires less work - 2 brick faces repaired
Ditto
Repointing required to north lightwell wall. CVA to request costs/schedule as part of brick repairs.
Ditto
Valley gutter has been stripped to reveal gutter board
Repointing to west facade where Stress UK works have been signed off. Snowcem mortar with has been used. Still drying out.
Lower sash to window EW.00.02 does not fit frame and requires replacement.
All upper sashes to west (street) elevation have been built fixed shut. School to confirm that they do not require opening.
Upper and lower sashes to EW.1.02 have been fixed shut. Lower sash to be eased open. School to confirm requirements.
Lower sash to EW.02.05 has rotten corner. Cost for splicing to be requested.
Internal and external frame to EW.02.05 is also rotten in both lower corners. Cost for splicing to be requested.
Ditto
Ditto
Cill to EW.02.13 is rotten. Cost to be requested for repair.
Demolition to corridor SH.G.04 are underway. Staircase has been opened up.
Remaining bulkhead to be removed.
Conservation have agreed to replacement of ID.01.21. CVA tor request approval of replacement with a 3 paneled door.
Ditto - proposed door height to be in line with 6 paneled internal door behind. Panels to be aligned with door behind. Cornice fixed above. Conservation officer to review for approval.
Additional plaster repairs are being scheduled by Bolt & Heeks. Conservation to approve the use of patch repair, bonding coat with skim. Walls to SH.1.05, Deputy Head Office: East.
SH.1.05, North. Lath exposed - plastering mesh to be laid directly onto timber.
SH.1.05, West.
SH.1.05, South.
SH.1.05, West - Tiles have been revealed beneath plaster. They are in poor condition and are very lose.
SH.1.05, West - Ditto
SH.1.06 Deputy Head Office: North
SH.1.06 East
SH.1.06 South
SH.1.06 West
SH.1.01 Second Master Office: North
SH.1.01 East
SH.1.01 South
SH.1.01 West
SH.1.01 South - Surface uneven above and below timber dado rail mount.
SH.1.01 West -Patch repairs required where masonry revealed.
SH.1.01 West - Repairs required to hearth. Conservation officer to advise
Ditto
SH.1.02 East
SH.1.02 South
SH.1.02 West
Joinery has been revealed at Level 2: SH.2.02, Office -
Conservation to advise on whether joinery must be retained.
SH.2.02 - HRW to check chimney structure
SH.2.06 Office -
Conservation to advise on whether joinery must be retained.
SH.2.06
SH.2.07 Meeting room -
Conservation to advise on whether joinery must be retained.
SH.2.07 lead chute gutter
SH.2.01 Office - Conservation to advise on whether joinery must be retained.
Lead chute gutter is visible behind gutter board
Gutter board height varies - B&H to provide survey
No comments: